Today I continued to up drill the holes in the turtle deck to #30.
Turtle Deck Installation
Today I worked on updrilling the holes to #30.
Turtle Deck Installaton
Fitting Formers
I fit all of the formers and drilled the#40 pilot holes. I now have what everyone calls the porcupine.
Installing the Turtle Deck
I pilot drilled the right hand #1 former today and started on the left hand #1 former.
Aft Fuselage
Today I started by reassembling the Aft Fuselage. After it was assembled I checked and then up drilled to 3/16 the 4 holes in the tail wheel mount and the forward lower mount angle. Next I proceeded to start up drilling to #30. Later I fit the turtle deck to the aft fuselage.
Turtle Deck
I finished drilling the turtle deck and splice channel and then temporarily clecoed the assembly together. Next I dismantled the assembly so that I could go back and re-assemble the aft fuselage in preparation for up drilling.
Turtle Deck Skin
I drilled all of the holes to connect the two turtle deck skins. Next, I worked on the slice assembly and drilled all of the holes for the brackets. Once this was complete I started to work on drilling all of the connecting holes through the top of the splice channel.
Turtle Deck Layout
I am continuing to layout all of the holes on the first turtle deck piece. Hopefully, I can then use this as a template for the second one. After each row of holes I double checked the dimensions. I used the metric measurements as a double check for most of the dimensions except for the larger horizontal dimensions for holes 24 to 29. For these holes I measured in metric as it was easier than using imperial dimensions due to my limited measuring tools.

You must be logged in to post a comment.