I cut out and drilled the aft tunnel angle this morning. Next I started to layout the forward Tunnel Zee
Aft Lower Cabin Details
This morning I am continuing to work on the parts for the Aft Lower Cabin and finished all of the pieces on the F10 Sheet
Aft Lower Cabin Details
Today I made a number of the parts for the aft lower cabin.
Rear Spar Carry Through Assembly
I continued to work on fuselage parts today. I had previously made a number of the parts for the rear spar carry through. Today I finished all of the drilling of these parts. I was short the AN3 hardware needed to bolt the pieces together so I need to order these from Aircraft Spruce.
Attach Angles
I drilled the holes in the attach angles.
Support Channels
I cut out and trimmed the right hand support channel.


You must be logged in to post a comment.